**This information includes most, but possibly not all requirements**
During your inspection the inspector will be looking for:

  • Site address marked, for locations see permit condition
  • Building permit
  • Mason County approved building plans and site plan
  • All nailing or screws installed/complete.
  • Wallboard installed separating garage from residence, per approved plans.
  • Usable space under stairways protected with ½” wallboard.
  • Wallboard at interior braced wall panels nailed, and installed correctly, per approved plans
  • **Approved site plans are required to be on-site with the approved plans at all times**
  • Additional inspections may be necessary as required by the Building Official, Fire Marshal, other Mason County Department, or engineer or geologist of record.
  • All construction must conform to the Mason County approved building plans and is subject to field corrections